Battery storage as an opportunity for farmers and investors
We lower the entry barriers for battery storage projects by taking care of trading, operations, regulation, and settlement - ensuring reliable revenues and optimal use of existing land and grid connections.
Standalone or combined with solar
A battery storage system can be installed on your land or alongside your PV plant. It stores electricity when renewable energy is abundant and feeds it back into the grid when it is needed most. This makes renewable energy more usable and ensures stable grid integration. The result: regular revenues, whether through your own investment or in partnership with others.
Battery storage: maximize renewables, secure stable revenues
Entrix is one of Europe’s leading battery storage optimizers. We unlock the full potential of your asset through intelligent trading across all major power markets and precise operational control. Our real-time algorithms analyze market signals and trade electricity exactly when it achieves the highest return. This means maximum profitability for your asset – while contributing to grid stability and renewable integration. With transparent revenue models, seamless technical integration, and continuous support, we make battery storage accessible, secure, and attractive.
Entrix offers more than just trading
Maximum revenues across all markets
Achieve maximum revenues across wholesale and ancillary service markets with our market-leading optimization.
Tailored solutions for your project
Innovative add-on modules such as Entrix FloorPlus for secured revenues or Entrix LocalFlex for grid-friendly operations.
Advisory, onboarding and more
Technical, regulatory, and operational services: from advisory and onboarding to 24/7 monitoring and reporting.
Market-leading performance for your battery storage
FAQ
What are the requirements for Entrix to optimize my battery?
Entrix manages storage assets starting from around 3 MW capacity. Smaller systems can be aggregated as part of our portfolio strategy. The key prerequisites are: a suitable grid connection, available space, and a realistic project timeline.
When does Entrix get involved?
As soon as a grid connection approval and a suitable site are secured, we support with structuring and preparation. Once the building permit is granted, we begin operational implementation and market optimization.
What technical requirements need to be met?
We operate vendor-agnostic and connect your asset to our platform via the EMS (energy management system). For operation, only a communication interface is required.
How does participation in ancillary service markets work?
Entrix manages the entire prequalification process and the operation of your storage asset for all relevant markets, including ancillary services.
Will my EEG remuneration remain in place with PV co-location?
Yes. We coordinate closely with EPCs and grid operators to ensure a compliant metering concept, so that EEG remuneration and guarantees of origin remain fully intact.
Get in touch with us
We are here to provide you with expert advice.