Maximizing the profit of grid-scale battery storage
Entrix supports project developers with a clear focus: maximizing revenues through intelligent battery storage commercialization across all relevant power markets.
Battery storage as a driver of profitability for your project pipeline
Flexibility is the key to profitable and future-proof energy projects. Battery storage improves bankability, increases project returns, and strengthens the asset profile for investors. In particular, co-location projects with solar plants create additional value: through lower grid costs, better land utilization, and combined revenue streams.
With Entrix, you unlock more value from every site.
Project developers face new challenges in battery storage projects: complex revenue models, volatile markets, stringent requirements for grid connection, and regulatory frameworks.Entrix provides support in technical and economic project modeling, selecting suitable storage and site configurations, and connecting to all relevant power markets. Our optimization is powered by proprietary AI algorithms with real-time control, >90% virtual cycles, and covers Day-Ahead, Intraday, FCR, and aFRR markets. We deliver realistic backtesting for investors and support with structured, transparent revenue models.
Entrix offers more than just trading
Maximum revenues across all markets
Achieve maximum revenues across wholesale and ancillary service markets with our market-leading optimization.
Tailored solutions for your project
Innovative add-on modules such as Entrix FloorPlus for secured revenues or Entrix LocalFlex for grid-friendly operations.
Advisory, onboarding and more
Technical, regulatory, and operational services: from advisory and onboarding to 24/7 monitoring and reporting.
Market-leading performance for your battery storage
FAQ
What are the requirements for Entrix to market my storage system?
Entrix manages storage systems starting at around 3 MW of capacity. Smaller systems can be aggregated as part of our portfolio strategy. The key factors are grid connection, available space, and a realistic project timeline.
When does Entrix become active?
With a confirmed grid connection and suitable site, we provide support in structuring and preparation. Following the building permit, we move on to operational execution and market integration.
What technical conditions must be in place?
We work vendor-agnostic and connect your system to our platform via the EMS (energy management system). The only requirement for operation is a communication interface.
How does participation in ancillary service markets work?
Entrix manages the entire prequalification process and the operation of your storage system for all relevant markets, including frequency regulation.
Will my EEG remuneration remain in place with PV co-location?
Yes. We coordinate with EPCs and grid operators to ensure a compliant metering concept, so that EEG remuneration and guarantees of origin are fully preserved.
Get in touch with us
We are here to provide you with expert advice.